Ensuring Quality and Consistency: Granite Select Fill Sampling at RAAF Darwin

Ensuring Quality and Consistency

Location: Darwin

Quality assurance is a critical part of delivering reliable construction materials and meeting project requirements. At the RAAF Darwin Project, SLS Pty Ltd undertakes regular sampling of Granite Select Fill to help ensure material consistency and compliance with project specifications.

Sampling is carried out every two weeks as part of the ongoing quality control process. This routine monitoring helps verify that the material remains consistent with the requirements established for assigned value determination and the project’s specified standards.

Through regular sampling and testing, variations in material properties can be identified and assessed, supporting informed decisions and maintaining confidence in the quality of the materials being supplied and used on site.

Our commitment to consistent sampling and quality assurance reflects the importance of maintaining reliable construction materials throughout the project. By implementing a systematic monitoring process, we help support compliance, consistency and the overall quality objectives of the RAAF Darwin Project.

Related Projects

Coffey Testing is conducting geotechnical testing, in order to prepare the ground prior to any construction occurring.
Coffey Testing is providing all earthworks, pavement, and concrete testing for the project.
Coffey Testing is proudly providing the geotechnical testing for Contract 2 (Pumicestone Road to Steve Irwin Way section) of the Bruce Highway: Caboolture-Bribie Island Road to Steve Irwin Way (Exit 163) (C2SIW) project.
Coffey Testing will be providing all field and laboratory quality assurance testing for the Gympie Arterial Road and Strathpine Road Interchange project.